Skip to main content
Fig. 11 | Functional Composite Materials

Fig. 11

From: Effects of curing on emulsion cold mix asphalts and their extracted binder

Fig. 11

Black diagram of the extracted binders of group B, (a) Round blue points represent 0d of curing, triangle yellow points represent 93d of curing, (b) Simplified zoom on results of tests at 20 °C and 10 Hz. The smaller blue points represent the extracted binder at t = 0 and every tested temperatures and frequencies. Points 1 to 5 display respectively 0, 14, 29, 59 and 93 days of curing. Points 1, 2, 3 and 4 correspond to 10 °C – 80 %RH while point 5 corresponds to 35 °C – 20 %RH.

Back to article page